| Client | Project Title & Location | Main Contractor | Description of Work | Value (RM) | Year |
|---|---|---|---|---|---|
|
DAYONE DATA CENTRES MALAYSIA SDN BHD PROJECT SITE : WISMA SUNWAY LEVEL 10 , ISKANDAR MEDINI , MALAYSIA |
DIRECT DEAL WITH OWNER |
ADDITIONAL ACMVADDITIONAL SUBMAIN CABLEADDITIONAL DB & ELECTRICAL WORK |
99,750.00 | 2026 |
|
APUDG SDN BHD PROJECT SITE : 8 SURIA BLK A 33 , JALAN PJU 1/42 , DATARAN PRIMA LEVEL 1 , LEVEL 3 & LIFT LOBBY |
DIRECT DEAL WITH OWNER |
STEEL STRUCTURE PLATFORMCARPET WORKKKELECTRICAL WORKCARPENTRY WORKREFURBISHMENT WORK |
233,450.00 | 2026 |
|
BANK RAKYAT PROJECT SITE : LEVEL 11 & 12 CORONATION SQUARE IBRAHIM INTERNATIONAL BUSINESS DISTRICT ( IIBD ) |
YAMA BINA SDN BHD |
CARPENTRY WORKGLASS WORKSTONE WORK |
435,00.00 | 2025 |
|
DAYONE DATA CENTRES MALAYSIA SDN BHD PROJECT SITE : WISMA SUNWAY LEVEL 10 , ISKANDAR MEDINI , MALAYSIA |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN AND PLANNINGHVMC WORKELECTRICAL WORKWALL FINISHESFLOOR FINISHESCEILING FINISHESFIRE PROTECTIONCUSTOM MADE FURNITURENETWORKING CABLING WORKWINDOW FINISHESLOOSE FURNITURE |
1.4 MILLION | 2025 |
|
APUDG SDN BHD PROJECT SITE : MENARA KOMTAR LEVEL 13 |
DIRECT DEAL WITH OWNER |
CEILING FINISHESAIRCOND WORKELECTRICAL WORKWALL FINISHESFLOOR FINISHESGLASS WORKLOOSE FURNITURE |
97,9870.00 | 2025 |
|
DESIRE LIMITLESS PROJECT : PLAZA PANTAI |
DIRECT DEAL WITH OWNER |
ACOUSTIC WALL PANELAIRCOND WORKLED LIGHTING SYSTEMAUDIO SYSTEMFLOOR FINISHESGLASS WORKM & E WORKKITCHEN EXHAUST SYSTEM |
673,550.00 | 2025 |
|
MYFEET ERGO ENTERPRISE PROJECT : SUNWAY PYRAMID |
DIRECT DEAL WITH OWNER |
CUSTOM MADE JOINERY WORKCEILING AND PARTITIONM & E WORKSCARPENTRY WORKACRYLIC WORKROLLER SHUTTESFLOOR FINISHES |
225,000.00 | 2024 |
|
MAMAWAY TRADING MALAYSIA SDN BHD Project : Puchong Office Project : Penang Shopping mall |
DIRECT DEAL WITH OWNER |
WALL FINISHESCEILING FINISHESFLOOR FINISHESM&E WORKCUSTOM MADE FURNITURECARPENTRY WORKINTERIOR DECORATION |
480,450.00 | 2024 |
|
KANOPY AMG SDN BHD PROJECT SITE : SUNWAY ISKANDAR M2 SHOP LOT JOLLY GOLFβIN |
DIRECT DEAL WITH OWNER |
WALL FINISHESCEILING FINISHESWINDOW & DOOR FINISHESFLOOR FINISHESM&E WORKCUSTOM MADE FURNITURECARPENTRY WORKINTERIOR DECORATION |
388,450.00 | 2024 |
|
KANOPY AMG SDN BHD PROJECT SITE : WISMA SUNWAY LEVEL 7 |
DIRECT DEAL WITH OWNER |
WALL FINISHESCEILING FINISHESWINDOW & DOOR FINISHESFLOOR FINISHESM&E WORKOFFICE LOOSE FURNITURECUSTOM MADE FURNITURECARPENTRY WORKGLASS WORKINTERIOR DECORATION |
678,950.00 | 2024 |
|
SUNWAY CONSTRUCTION SDN. BHD. PROJECT SITE : SEDENAK YONDR SITE OFFICE EXTENSION WORK |
DIRECT DEAL WITH OWNER |
INDUSTRIES ROOFING WORKPIR EXTERNAL WALLINTERNAL CEILINGELECTRICAL WORKACMVLOOSE FURNITURESYSTEM FURNITURE |
434,250.00 | 2024 |
|
SUNWAY ISKANDAR SDN BHD PROJECT SITE : WISMA BIGBOX OFFICE LEVEL 9 SUNWAY SSR PHASE 2 |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGNBUILT-IN FURNITUREWALL FINISHESCUSTOM MADE ID WORKFLOOR FINISHESM & E WORKS |
178,800.00 | 2024 |
|
NEC CORPORATION OF MALAYSIA SDN BHD PROJECT SITE: SUNWAY BIGBOX OFFICE TOWER LEVEL 2 |
DIRECT DEAL WITH OWNER |
WALL FINISHESCEILING FINISHESFLOOR FINISHESWETWORKELECTRICAL WORKACMVCARPENTRY WORKSERVER SYSTEMLOOSE FURNITURE |
1.95 MILLION | 2024 |
|
SUNWAY ISKANDAR SDN BHD PROJECT SITE : WISMA BIGBOX OFFICE LEVEL 9 SUNWAY SOUTHERN REGION OFFICE |
DIRECT DEAL WITH OWNER |
BUILT-IN FURNITURELOOSE FURNITUREDECORATIVE WALL PANELINGWALL FINISHESCUSTOM MADE ID WORK |
998,670.00 | 2024 |
|
SUNWAY ISKANDAR SDN BHD PROJECT SITE : WISMA BIGBOX OFFICE β IRDA OFFICE LEVEL 1 , 2 & 4 |
DIRECT DEAL WITH OWNER |
BUILT-IN FURNITURELOOSE FURNITURE |
938,000.00 | 2023 |
|
MOODY COW RETAIL SHOP PROJECT SITE : PARADIGM MALL ( SKUDAI , JOHOR ) |
DIRECT DEAL WITH OWNER |
BUILT-IN FURNITURELOOSE FURNITUREGLASS WALL PANELINGSPC FLOORING |
228,000.00 | 2023 |
|
SPICES CURRY KINGDOM CORNER PROJECT SITE : SUNWAY ISKANDAR M3 SHOPLOT |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGNCONSTRUCTION WORKCEILING WORKM & E WORKPLUMBING WORKCARPENTRY WORKGLASS WORKVENTILATION SYSTEM |
342,500.00 | 2023 |
|
MYFEET FOOT CARE SERVICES PROJECT SITE: PAVILION BUKIT JALUL |
DIRECT DEAL WITH OWNER |
CUSTOM MADE JOINERY WORKCEILING AND PARTITIONM & E WORKSMISCELLANEOUS RENOVATION WORKS |
227,600.00 | 2023 |
|
PELABUHAN TANJUNG PELEPAS SDN BHD PROJECT SITE: PTP |
DIRECT DEAL WITH OWNER |
DESIGN & PLANNING CONSULTANTFLOOR FINISHESCEILING FINISHESWALL FINISHESCUSTOM MADE FURNITUREM & E WORK |
71,184.00 | 2023 |
|
MEDINI CITY MANAGEMENT SDN BHD PROJECT SITE : LEVEL 18 , MEDINI 9 BUILDING , MEDINI , ISKANDAR PUTERI |
DIRECT DEAL WITH OWNER |
CUSTOM MADE CARPENTRY WORKUSGBORAL CEILINGUSGBORAL FIRE RATED DRYWALLFLOOR FINISHINGID FIT-OUT WORKSM & E WORKS |
543,678.00 | 2022 |
|
PELABUHAN TANJUNG PELEPAS SDN BHD PROJECT SITE: PTP |
DIRECT DEAL WITH OWNER |
DESIGN & PLANNING CONSULTANTFLOOR FINISHESCEILING FINISHESWALL FINISHESCUSTOM MADE FURNITUREM & E WORKM&E WORK |
1.05 MILLION | 2022 |
|
PELABUHAN TANJUNG PELEPAS SDN BHD PROJECT SITE: PTP |
DIRECT DEAL WITH OWNER |
CUSTOM MADE PANTRY CABINETPANTRY EQUIMENTTOILET UPGRADING WORKM&E WORK |
298,000.00 | 2022 |
|
YOKOGAWA KONTROL ( M ) SDN BHD PROJECT SITE: PENGERANG |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN AND BUILDPLASTER CEILING & DRYWALLM & E WORKFLOOR FINISHESCUSTOM MADE FURNITURELIGHT CONSTRUCTION WORK |
396,470.00 | 2022 |
|
SEDGWICK MALAYSIA SDN BHD MENARA LANDMARK LEVEL 29 |
FACILITIESLINK ( M ) SDN BHD |
GYPSUM PARTITION WORKFLOORING WORKM&E WORKCUSTOM MADE FURNITURE |
98,750.00 | 2021 |
|
METRO POINT COLLEGE SDN BHD PROJECT SITE : WISMA HOCK YEE HIN |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN AND BUILDM&E WORKINTERNAL DRYWALL AND GLASSSUSPENDED CEILINGCUSTOM MADE FURNITURE |
437,800.00 | 2021 |
|
M SOLE SDN BHD NEW OUTLET : TOPPEN SHOPPING MALL TERBAU CITY , JOHOR BAHRU |
DIRECT DEAL WITH OWNER |
CUSTOM MADE JOINERY WORKCEILING AND PARTITIONM & E WORKSMISCELLANEOUS RENOVATION WORKS |
147,740.00 | 2019 |
|
DAIWA HOUSE MALAYSIA SDN BHD SITE : MENARA UOA BUSINESS PARK β NEW OFFICE |
DIRECT DEAL WITH OWNER |
OFFICE RENOVATION WORKFLOORINGLOOSE FURNITUREID BUILD IN FURNITUREINTERIOR DESIGN PROPOSALVINYL FLOOR SYSTEM |
94,500.00 | 2019 |
|
FEETNET FOOT CARE. PROJECT : NEW OUTLET ONE UTAMA SHOPPING MALL |
DIRECT DEAL WITH OWNER |
CUSTOM MADE JOINERY WORKCEILING AND PARTITIONM & E WORKSMISCELLANEOUS RENOVATION WORKS |
169,000.00 | 2019 |
|
FEETNET FOOT CARE. PROJECT : NEW OUTLET MID VALLEY , SOUTHKEY |
DIRECT DEAL WITH OWNER |
CUSTOM MADE JOINERY WORKCEILING AND PARTITIONM & E WORKSMISCELLANEOUS RENOVATION WORKS |
175,000.00 | 2019 |
|
EUROPEAN PROFILES MALAYSIA SDN BHD PROJECT SITE: SUNWAY CITRINE LEVEL 03A-11 NUSAJAYA |
DIRECT DEAL WOTH OWNER |
DESIGN & BUILDM & E WORKSMISCELLANEOUS RENOVATION WORKS |
106,000.00 | 2018 |
|
SA ARCHITECTS SDN BHD PROJECT: SUNWAY M1 CITRINE LEVEL 5 |
DIRECT DEAL WITH OWNER |
M & E WORKSMISCELLANEOUS RENOVATION WORKSOFFICE FURNITURE & EQUIPMENT |
108,000.00 | 2018 |
|
SUNWAY ISKANDAR SDN BHD PROJECT : SUNWAY M1 CITRINE LEVEL 7 |
DIRECT DEAL WITH OWNER |
MISCELLANEOUS RENOVATION WORK |
214,000.00 | 2018 |
|
SUNWAY ISKANDAR SDN BHD PROJECT : SUNWAY M1 CITRINE β LEVEL 7 |
DIRECT DEAL WITH OWNER |
ID BUILD IN WORKINTERIOR RENOVATION |
543,000.00 | 2017 |
|
SA ARCHITECTS SDN BHD PROJECT: SUNWAY GEO KL LEVEL 6 β SAA OFFICE |
DIRECT DEAL WITH OWNER |
ID BUILD IN FURNITUREPAINTING WORK |
687,000.00 | 2017 |
|
SUNWAY CONSTRUCTION SDN. BHD. PROJECT: BIGBOX SITE OFFICE , SUNWAY ISKANDAR |
DIRECT DEAL WITH OWNER |
CONCRETE FLOORCOLD ROOM PANEL OFFICE SYSTEMINDUSTRIAL ROOFINGINTERIOR FINISHES |
350,000.00 | 2017 |
|
MF OPTIONS FOOT VENTURE PROJECT : NEW OUTLET AEON KINTA CITY , IPOH. |
DIRECT DEAL WITH OWNER |
CUSTOM MADE JOINERY WORKCEILING AND PARTITIONM & E WORKSMISCELLANEOUS RENOVATION WORKS |
176,000.00 | 2017 |
|
FEETNET FOOT CARE. PROJECT : NEW OUTLET AEON TEBRAU CITY , JB. |
DIRECT DEAL WITH OWNER |
CUSTOM MADE JOINERY WORKCEILING AND PARTITIONM & E WORKSMISCELLANEOUS RENOVATION WORKS |
155,000.00 | 2017 |
|
DAIWA HOUSE MALAYSIA SDN BHD SITE : SUNWAY M1 CITRINE LEVEL 2 OFFICE |
DIRECT DEAL WITH OWNER |
OFFICE RENOVATION WORKFLOORINGLOOSE FURNITUREID BUILD IN FURNITUREINTERIOR DESIGN PROPOSAL |
114,430.00 | 2017 |
|
SUNWAY CONSTRUCTION SDN. BHD. PROJECT: M3 SITE OFFICE , SUNWAY ISKANDAR |
DIRECT DEAL WITH OWNER |
CONCRETE FLOORCOLD ROOM PANEL OFFICE SYSTEMINDUSTRIAL ROOFINGINTERIOR FINISHES |
107,000.00 | 2017 |
|
SUNWAY PROPERTY SDN BHD PROJECT: M1 CITRINE MEETING ROOM , RETAIL OFFICE , MAINTENANCE ROOM , NUSAJAYA , JOHOR |
DIRECT DEAL WITH OWNER |
CUSTOM MDE FURNITUREREADY MADE OFFICE FURNITURECEILINGPARTIITION |
243,000.00 | 2016 |
|
PCQ HAIR & BEAUTY SDN BHD PROJECT : NEW OUTLET HOLIDAY PLAZA , JB |
DIRECT DEAL WITH OWNER |
CUSMTOM MADE JOINERY & CARPENTRYM & E WORKMISC REMOVATION WORK |
163,850.00 | 2016 |
|
SOON THYE HANG PROJECT: NEW OUTLET IN PLAZA SINGAPORE , SINGAPORE |
DIRECT DEAL WITH OWNER |
CUSTOM MADE JOINERY WORKCEILING , PARTITIONM & E WORKMISC RENOVATION WOR |
SGD 57,500.00 | 2016 |
|
SUMITOMO MITSUI CONSTRUCTION CO,. LTD PROJECT : CITY SQUARE OFFICE TOWER LEVEL 23 |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGNCUSTOM FURNITUREM & E WORKGLASS PARTITIONCARPETOFFICE WORKSTATION |
198,160.00 | 2016 |
|
INTERNATIONAL SOS MENARA UOA BANGSAR |
CABLEPLANT ENGINEERING SDN BHD |
REINSTATEMENT WORK |
69,8500.00 | 2015 |
|
MIGHTY BAKERY SDN. BHD. LOT : 3722 , JALAN PERINDUSTRIANBALAKONG JAYA ½ , TMN PERINDUSTRIAN BALAKONG JAYA 2 ,43300 BALAKONG JAYA , SELANGOR. |
DIRECT DEAL WITH OWNER |
DESIGN AND BUILDLAB ROOMMETAL WORKPUMBL;ING WATERTREATMENT WORK |
245,350.00 | 2015 |
|
FDIRECT MARKETING SDN. BHD PROJECT SITE : CITY SQUARE OFFICE TOWER 23.A TH FLOOR |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN CONSULTANTCUSTOM FURNITUREGYPSUM PARTITIONSYSTEM GLASS PANELREADY MADE FURNITUREM & E WORK |
115,000.00 | 2014 |
|
TELEXPRESS CORP PROJECT SITE : CITY SQUARE 30 TH FLOOR EXTEND PLANT |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGNGYPSUM / GLASS PARTITIONCUSTOM FURNITUREREADY MADE FURNITUREM & E WORKFIBRE CABLINGSERVER SYSTEM SETUPFLOORING CARPETRAISED FLOOR SYSTEM |
467,500.00 | 2014 |
|
BH APPARE S/B PROJECT SITE : KB MALL KELANTAN |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDPLASTERING CEILINGFLOOR TILESCUSTOM MADE FURNITURETEMPERED GLAS |
114,500.00 | 2014 |
|
YUNG FA CORP. SDN BHD PROJECT SITE : QUILL CITY KUALA LUMPUR |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDPLASTERING CEILINGFLOOR TILESCUSTOM MADE FURNITURETEMPERED GLASS |
146,250.00 | 2014 |
|
YUNG FA CORP. SDN BHD PROJECT SITE : IOI MALL PUTRA JAYA |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDPLASTERING CEILINGFLOOR TILESCUSTOM MADE FURNITURETEMPERED GLASS |
366,750.00 | 2014 |
|
CAPITAL BRIAN ADVISORY SDN. BHD. PELANGI OFFICE TOWER LEVEL 15 |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDPLASTERING CEILINGCUSTOM MADE FURNITURETEMPERED GLASS |
36,250.00 | 2014 |
|
AJM PLANNING AND URBAN DESIGN GROUP NEW OFFICE BUILDING 33, JALAN PJU 1/42 , PETALING JAYA |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGNCUSTOM MADE FURNITURE |
128,000.00 | 2014 |
|
YUNG FA CORP. SDN BHD PROJECT SITE : PLAZA ANGSANA |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDPLASTERING CEILINGFLOOR TILESCUSTOM MADE FURNITURETEMPERED GLASS |
176,350.00 | 2014 |
|
YUNG FA CORP. SDN BHD PROJECT SITE : SERI ALAM |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDPLASTERING CEILINGFLOOR TILESCUSTOM MADE FURNITURETEMPERED GLASSGYPSUM PARTITIONM & E WORK |
175,000.00 | 2014 |
|
HYUNDAI MERCHANT MARINE (M) SDN. BHD. PROJECT SITE : BANGUNAN PELANGI 3A FLOOR |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDSUSPENDED CEILINGFLOOR TILESCUSTOM MADE FURNITURETEMPERED GLASSOFFICE EQUIPMENTCARPETGYPSUM PARTITIONM & E WORK |
108,050.00 | 2014 |
|
CA BOARDROOM PTL PROJECT SITE : PELANGI OFFICE TOWER LEVEL 4 |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDSUSPENDED CEILINGFLOOR TILESCUSTOM MADE FURNITURETEMPERED GLASSOFFICE EQUIPMENTCARPETGYPSUM PARTITIONM & E WORK |
43,650.00 | 2014 |
|
WIDAT BUILDER MALAYSIA PROJECT SITE : CITY SQUARE OFFICE TOWER 30 TH FLOOR |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGNCUSTOM FURNITUREGYPSUM PARTITIONPLASTER CEILINGSYSTEM GLASS PANELREADY MADE OFFICE EQUIPMENTREADY MADE OFFICE FURNITUREM & E WORK |
235.000.00 | 2014 |
|
ADECCO PERSONAL SDN. BHD. PROJECT SITE : CITY SQUARE OFFICE TOWER 23 TH FLOOR |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN CONSULTANTCUSTOM FURNITUREGYPSUM PARTITIONPLASTER CEILINGSYSTEM GLASS PANELREADY MADE OFFICE EQUIPMENTREADY MADE OFFICE FURNITUREM & E WORK |
126.000.00 | 2014 |
|
YUNG FA CORP. SDN BHD PROJECT SITE : IPOH PARADE , KLANG PARADE |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDPLASTERING CEILINGFLOOR TILESCUSTOM MADE FURNITURETEMPERED GLASS |
446,048.00 | 2014 |
|
YUNG FA CORP. SDN BHD PROJECT SITE : METRO POINT KAJANG , |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDPLASTERING CEILINGFLOOR TILESCUSTOM MADE FURNITURETEMPERED GLASS |
246,748.00 | 2013 |
|
YUNG FA CORP. SDN BHD PROJECT SITE : BUKIT RAJA KLANG |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDPLASTERING CEILINGFLOOR TILESCUSTOM MADE FURNITURETEMPERED GLASS |
176,788.00 | 2013 |
|
SANUBARI CEKAL SDN. BHD PROJECT SITE : 41 , JALAN INDAPURA , KULAI |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDSUSPENSION CEILINGFLOOR TILESCUSTOM MADE FURNITUREM & E WORKTEMPERED GLASSGYPSUM PARTITIONREPAINTING WORK |
179,446.00 | 2013 |
|
|
THE GLOW WELLNESS CENTRE SDN BHD PELANGI OFFICE TOWER 8 TH FLOOR AREA |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDSUSPENSION CEILINGFLOOR TILESCUSTOM MADE FURNITUREM & E WORKTEMPERED GLASSGYPSUM PARTITIONREPAINTING WORK |
165,500.00 | 2013 |
|
7-11 CONVENIENT SHOP SITE : TAMAN FLORA |
DIRECT DEAL WITH OWNER |
MISCELLANEOUS RENOVATION WORK TO NEW STORE AT JOHOR |
32,400.00 | 2013 |
|
BIOFACT LIFE SDN. BHD PROJECT AREA : JUSCO KULAI , JOHOR |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDPLASTERING CEILINGFLOOR TILESINTERIOR DESIGNCUSTOM MADE FURNITUREM & E WORK |
97,653.00 | 2013 |
|
SWENGTEE INTERNATIONAL S/B PELANGI OFFICE TOWER 8 TH FLOOR |
DIRECT DEAL WITH OWNER |
GYPSUM PARTITIONSUSPENSION CEILINGPLASTERING CEILINGFLOOR TILESINTERIOR DESIGNCUSTOM MADE FURNITUREM & E WORK |
74,860.00 | 2013 |
|
BINA BCO SDN. BHD PROJECT SITE : 28 TH FLOOR CITY SQUARE OFFICE TOWER |
DIRECT DEAL WITH OWNER |
GYPSUM PARTITIONINTERIOR DESIGNCUSTOM MADE FURNITUREM & E WORK |
74,860.00 | 2013 |
|
YS MASTER SDN. BHD. No : 23 & 25 , JALAN MEGA ¼ , TAMAN PERINDUSTRIAL NUSA , 79200 NUSAJAYA , JOHOR JUSCO KULAI |
DIRECT DEAL WITH OWNER |
INDESIGN & BUILDCUSTOM-MADE FURNITUREPLASTER CEILING / FLOOR TILEKITHCEN FACILITIESM & E WORKDECORATION FURNITURETERIOR |
120,120.00 | 2013 |
|
YUNG FA CORP. SDN BHD PROJECT SITE : JUSCO KULAI |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDPLASTERING CEILINGFLOOR TILESCUSTOM MADE FURNITURETEMPERED GLASS |
216,788.00 | 2013 |
|
SIEMENS MALAYSIA SDN. BHD PROJECT SITE : 41 , JALAN MEGA 1/6 , PERDUSTARIAN NUSA CEMERLANG , 81550 GELANG PATSH |
DIRECT DEAL WITH OWNER |
GYPSUM PARTITIONSUSPENSION CEILINCUSTOM MADE FURNITUREM & E WORK |
20,500.00 | 2013 |
|
PASTRYVILLA RETAIL (M) SDN BHD E@CURVE SHOPPING CENTRE |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDPLASTERING CEILINGFLOOR TILESINTERIOR DESIGNCUSTOM MADE FURNITUREKITHCEN SETUP AND BUILD |
97,653.00 | 2013 |
|
BARCLAYSS RETAURANT 18 , JALAN BELADAU 15 , TAMAN PUTRI WANGSA , 81800 ULU TIRAM |
DIRECT DEAL WITH OWNER |
KITCHEN FACILITY SETUPDESIGN AND BUILDINTERIOR RENOVATIONEXTENSION CONSTRUCTIONMETAL WORKM & E WORK |
276,760.00 | 2013 |
|
YUNG FA CORP. SDN BHD PLAZA METRO KAJANG |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDPLASTERING CEILINGFLOOR TILESINTERIOR DESIGNCUSTOM MADE FURNITURETEMPERED GLASS |
336,728.00 | 2013 |
|
PASTRYVILLA RETAIL (M) SDN BHD HARTAMAS SHOPPING CENTRE |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDPLASTERING CEILINGFLOOR TILESINTERIOR DESIGNCUSTOM MADE FURNITUREKITHCEN SETUP AND BUILD |
196,340.00 | 2013 |
|
YS MASTER SDN. BHD. No : 23 & 25 , JALAN MEGA ¼ , TAMAN PERINDUSTRIAL NUSA , 79200 NUSAJAYA , JOHOR USJ 19 , KUALA LUMPUR |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDCUSTOM-MADE FURNITUREPLASTER CEILING / FLOOR TILEKITHCEN FACILITIESM & E WORKDECORATION FURNITURE |
108,250.00 | 2013 |
|
Z-CEP ENERGY MANAGEMENT SDN. BHD. PELANGI OFFICE TOWER LEVEL 11 TH FLOOR |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDPLASTERING CEILINGVINYL TILESINTERIOR DESIGNCUSTOM MADE FURNITURETEMPERED GLASSM AND E WORK |
96,750.00 | 2013 |
|
TELEXPRESS CORP CITY SQUARE 30 TH FLOOR |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGNGYPSUM / GLASS PARTITIONCUSTOM FURNITUREREADY MADE FURNITUREM & E WORKFIBRE CABLINGSERVER SYSTEM SETUPFLOORING CARPETRAISED FLOOR SYSTEM |
467,500.00 | 2013 |
|
PERMODALAN NASIONAL BERHAD CITY SQUARE 30 TH FLOOR |
DIRECT DEAL WITH OWNER |
COMMEND CORRIDORFIRE RATED LIGHT BRICKFIRE DAMPERFIRE DOORSYSTEMFLOORTILES |
72,600.00 | 2013 |
|
GERBANG NUSAJAYA SDN. BHD. MLO : 4018 , JALAN PERMATANG , OFF JALAN PERMATANG 8A , TMN KEMPAS BARU, JOHOR. PROJECT SITE: PODIUM JOHOR |
DIRECT DEAL WITH OWNER |
GYPSUM PARTITIONFIRE RATED SYSTEMACOUSTIC SYSTEM |
421,633.00 | 2013 |
|
YUNG FA CORP. SDN .BHD. TESCO KEPONG |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDPLASTERING CEILINGFLOOR TILESINTERIOR DESIGNCUSTOM MADE FURNITURETEMPERED GLASS |
231,500.00 | 2013 |
|
YS MASTER SDN. BHD. No : 23 & 25 , JALAN MEGA ¼ , TAMAN PERINDUSTRIAL NUSA 79200 NUSAJAYA , JOHOR DATARAN PAHLAWAN MELAKA |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDPLASTERING CEILINGFLOOR TILESINTERIOR DESIGNCUSTOM MADE FURNITURETEMPERED GLASS |
87,600.00 | 2013 |
|
YUNG FA CORP. SDN BHD CITY SQUARE , JOHOR |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDPLASTERING CEILINGFLOOR TILESINTERIOR DESIGNCUSTOM MADE FURNITURETEMPERED GLASS |
269,890.00 | 2013 |
|
YS MASTER SDN. BHD. No : 23 & 25 , JALAN MEGA ¼ , TAMAN PERINDUSTRIAL NUSA , 79200 NUSAJAYA , JOHOR IOI MALL PUCHONG , SELANGOR |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDCUSTOM-MADE FURNITUREPLASTER CEILING / FLOOR TILEKITHCEN FACILITIESM & E WORKDECORATION FURNITURE |
76,000.00 | 2013 |
|
VERNβ HOLDING SDN. BHD. NO : 27 , JALAN PJS 11/11 , SUNWAY , 46150 PETALING SELANGOR . STORE : KOTA TINGGI STORE ; CITY SQUARE |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDCUSTOM FURNITUE |
265,000.00 | 2012 |
|
YS MASTER SDN. BHD. No : 23 & 25 , JALAN MEGA ¼ , TAMAN PERINDUSTRIAL NUSA , 79200 NUSAJAYA , JOHOR PUBLIKA KUALA LUMPUR |
DIRECT DEAL WITH OWNER |
REINSTAMENT WORK |
85,000.00 | 2012 |
|
TONG PAK FU DESSERT SDN BHD No.74, JALAN SUTERA TANJUNG 8/4, TAMAN SUTERA UTAMA, 81300 SKUDAI, JOHOR. |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDCUSTOM MADE FURNITUREAND SOFASUSPEND CEILINGM & E WORKKITCHEN EQUIPMENT |
186,600.00 | 2012 |
|
METRO POINT COLLEGE CITY SQUARE OFFICE TOWER 28 TH FLOOR |
DIRECT DEAL WITH OWNER |
CUSTOM MADE FURNITURETEMPERED GLASSFLOOR TILESGYPSUM PARTITIONOFFICE FURNITUREM & E WORK |
236,700.00 | 2012 |
|
EAUSTAGE ENTERPRISE NO.45, JALAN UTAMA 44, MUTIARA SQUARE, MUTIARA RINI, 81300 SKUDAI, JOHOR. |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDCUSTOM MADE FURNITUREM & E WORKLAMINATED FLOORING |
78,500.00 | 2012 |
|
YUNG FA CORP. SDN BHD LEGO LAND NUSAJAYA |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN & BUILDPLASTERING CEILINGFLOOR TILESINTERIOR DESIGNCUSTOM MADE FURNITURETEMPERED GLASS |
165,780.00 | 2012 |
|
M & A SECURITIES SDN BHD SUITE : 5.1 , LEVEL 5 , MENARA PELANGI OFFICE TOWER |
CABLEPLANT ENG. S/B |
GYPSUM PARTITIONPAINTING WORKWIRING WORKFLOOR TILES /CARPET |
119,800.00 | 2011 |
|
YUNG FA CORP. SDN. BHD. JUSCO TERBAU CITY |
DIRECT DEAL WITH OWNER |
PLASTERGLASS CEILINGFLOOR TILESINTERIOR DESIGNPAINTING WORKCUSTOM MADE FURNITURETEMPERED GLASS |
385,000.00 | 2011 |
|
CRAWFORD & COMPANY ADJUSTERS ( M ) S/B MENARA LANMARK 21 TH FLOOR |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGNCUSTOM MADE FURNITUREM & E WORKREADY MADE OFFICEFURNITURE & EQUIPMENT |
89,650.00 | 2011 |
|
ABDUL RAMAN SAAD ASSOCAITES PELANGI OFFICE TOWER 12 TH FLOOR |
DIRECT DEAL WITH OWNER |
FIRE RATED SYSTEM |
38,980.00 | 2010 |
|
DAHAM-BUSH NO : 16 , JALAN MOLE 1/31 , TAMAN MOLEK , 81100 JOHOR BAHRU. |
DIRECT DEAL WITH OWNER |
GYPSUM PARTITIONPAINTING WORKAIR-COND ITIONINGWIRING WORKFLOOR TILES /CARPETSIGNAGE BOARDGLASS WORK |
104,560.00 | 2010 |
|
METRO POINT COLLEGE CITY SQUARE OFFICE TOWER 28 TH FLOOR |
DIRECT DEAL WITH OWNER |
CUSTOM MADE FURNITURETEMPERED GLASSFLOOR TILESGYPSUM PARTITIONOFFICE FURNITUREM & E WORK |
72,600.00 | 2010 |
|
PM SECURITIES SDN. BHD. SUITE : 5.1 , LEVEL 5 , MENARA PELANGI OFFICE TOWER & NEW OFFICE AT MOLEK BRANCH |
DIRECT DEAL WITH OWNER |
FIRE RATED SYSTEMFLOOR TILESGYPSUM PARTITIONREINSTATEMENT TO PELANGI OFFICE TOWER |
98,650.00 | 2010 |
|
S.T.S. SDN. BHD. NO : 34 , JALAN PERMAS 10 , BANDAR BARU PERMAS JAYA 81750 MASAI , JOHOR BAHRU, JOHOR |
DIRECT DEAL WITH OWNER |
GYPSUM PARTITION2β x 4β SUSPENDED CEILINGCARPET TILES FLOORINGDECORATION FLOOR TILESOFFICE FURNITUREGLASS WORKCUSTOM MADE FURNITURE |
89,500.00 | 2009 |
|
ASTRO TAMAN MOLEK BRANCH |
CCL FURNISH.SDN. BHD. |
GYPSUM PARTITIONPLASTERGLASS CEILINGTEMPERED GLASSDECORATIVE GLASS WORKCARPET FLOORINGROLLER BLINDPANTING WORKCONSTRUCTION WORKS |
119,000.00 | 2009 |
|
APPLE TREE JUSCO TERBAU CITY JOHOR JUSCO BUKIT INDAH JOHOR |
DIRECT DEAL WITH OWNER |
GYPSUM PARTITIONPLASTERGLASS CEILINGTEMPERED GLASSCUSTOM FURNITURE |
108,000.00 | 2009 |
|
SCOTIABANK NO : 37 , JALAN MOLEK 3/10 , TAMAN MOLEK , 81100 JOHOR BAHRU. |
DIRECT DEAL WITH OWNER |
2 HOURS FIRE RATED SYSTEM |
28500.00 | 2008 |
|
HUMI PAK SDN. BHD. NO : 6 , JALAN MASAI LAMA BANDAR SERI ALAM , 81750 JOHOR. |
DIRECT DEAL WITH OWNER |
GYPSUM PARTITION2β x 4β SUSPENDED CEILINGCARPET FLOORINGM & E WO RKALUMINIUM WORK |
64,500.00 | 2007 |
|
METRO POINT COLLEGE CITY SQUARE OFFICE TOWER 28 TH FLOOR |
DIRECT DEAL WITH OWNER |
TEMPERED GLASS PARTITIONFLOOR TILESSUSPENDED CEILINGNET WORK CABLINGM & E WORKINTERIOR DESIGNCUSTOM MADE FUTNITUREDECORATIVE CARPETOFFICE EQUIPMENTGYPSUM PARTITION |
289,000.00 | 2007 |
|
JAC RECRUITMENT MALAYSIA CITY SQUARE OFFICE TOWER 23TH FLOOR |
DIRECT DEAL WITH OWNER |
CUSTOM MADE FURNITURETEMPERED GLASS PANELM & E WORKINTERIOR DESIGN & BUILDOFFICE EQUIPMENT |
117,500.00 | 2006 |