Major Projects
| Client | Project Title & Location | Main Contractor | Description of Work | Value (RM) | Year |
|---|---|---|---|---|---|
|
KPJ JOHOR SPECIALIST Project title : Renovation & ID Work to Sing bedded Ward 408 & 409 |
DIRECT DEAL WITH OWNER |
CEILING & WALL FINISHESBUILT-IN CARPENTRY WORKBUILT-IN & LOOSE FURNITUREUPGRADING TOILETWINDOW TREATMENT |
246,250.00 | 2026 |
|
GLENEAGLES HOSPITAL MEDINI , JOHOR PROJECT AREA : BOOMGROW EXPERIENCE CENTRE |
DIRECT DEAL WITH OWNER |
CONCRETE FLOOR & TILESSTEEL STRUCTURE WORKWATER DRAINAGE SYSTEMM & E WORKSLANDSCAPE WORKGLASS WORKCUSTOM MADE FURNITURE |
326,660.00 | 2026 |
|
UNIVERSITY MALAYSIA SPECIALIST CENTRE PROJECT SITE : UMSC LEVEL 4 Admin Office |
DIRECT DEAL WITH OWNER |
CUSTOM MADE FURNITURESOLID SURFACE TOP |
213,450.00 | 2026 |
|
GLENEAGLES HOSPITAL MEDINI , JOHOR PROJECT TITLE : NEUROSCIENCE SPECIALIST CLINIC COMPLEX |
DIRECT DEAL WITH OWNER |
RENOVATION WORKSINTERIOR ID WORKSMECHANICAL & ELECTRICAL WORKS |
3.15 MILLION | 2025 |
|
DESARU SOUTH COURSE SB PROJECT TITLE : UPGRADING & ENHANCEMENT WORK TO ROYAL LYTHAM & MUIRFIELD THE ELS CLUB DESARU |
DIRECT DEAL WITH OWNER |
CARPENTRY WORKSFLOOR FINISHESCURTAIN WORKM & E WORKWALL FINISHES |
123,850.00 | 2025 |
|
GLENEAGLES HOSPITAL MEDINI , JOHOR PROJECT AREA : BOOMGROW UPGRADING WORK |
DIRECT DEAL WITH OWNER |
ADDITIONAL OUTDOOR LIGHTINGEXTERNAL ROOFINGWATER DRAINAGE SYSTEMLANDSCAPE WORKEXTERNAL WALKING PATHLOOSE FURNITURE |
467,570.00 | 2025 |
|
UNIVERSITY MALAYSIA SPECIALIST CENTRE PROJECT SITE : UMSC LEVEL 2 SPECIALIST CLINICS |
DIRECT DEAL WITH OWNER |
DEMOLISHMENT WORKACHITECTURE WORKSELECTRICAL WORKELC SERVICESSANITARY & PLUMBING WORKSACMVFIRE PROTECTIONMEDICAL GAS SERVICESLOOSE FURNITURECUMTOM MADE FURNITURE |
1.35 MILLION | 2025 |
|
DESARU DEVELOPMENT HOLDINGS ONE SDN BHD PROJECT SITE LAMAN DESARU COAST β GYM ROOM , SECURITY & AUXILIARY POLICE AY BOH |
DIRECT DEAL WITH OWNER |
ALUMINIUM GLASS WALLTIMBER FLOORINGMIRROR WALLM & E WORKGENERAL RENOVATION WORK |
147,650.00 | 2024 |
|
DESARU DEVELOPMENT HOLDINGS ONE SDN BHD PROJECT SITE : THE WESTIN DESARU MAIN LOBBY , MIX LOUNGE , BRAB AND GO , PREFUNCTION AREA , CARPARK LIFT LOBBY , GARDEN SUITE LOBBY |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN UPGRADING WORKCARPENTRY WORKFLOOR FINISHESWALL FINISHESCEILING FINISHESM & E WORKLANDSCAPE WORKLOOSE FURNITUREINTERIOR DECORATIVE |
1.57 MILLION | 2024 |
|
GLENEAGLES HOSPITAL MEDINI , JOHOR PROJECT AREA : BOOMGROW PROJECT |
DIRECT DEAL WITH OWNER |
EXTERIOR DESIGN & BUILD WORKEXTERNAL CONCRETE WORKCONCRETE IMPRINTEXTERNAL CANOPYLANDSCAPE WORKM & E WORKLOOSE FURNITURE |
986,540.00 | 2024 |
|
GLENEAGLES HOSPITAL MEDINI , JOHOR PROJECT AREA : OβBRIEN RETAIL SHOP |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN PROPOSALNEW EXHAUST SYSTEMNEW SHOPFRONT IMAGEALUMINIUM FOLDING DOORGLASS WORK |
146,680.00 | 2024 |
|
KPJ JOHOR SPECIALIST HOSPITAL PROJECT SITE: KPJ ABDUL SAMAD L1-DISCHARGE SUITE L1-ADMISSION SUITE |
DIRECT DEAL WITH OWNER |
REBURBISHMENT WORKUPGRADING WORK |
96,750.00 | 2024 |
|
GLENEAGLES HOSPITAL MEDINI , JOHOR PROJECT AREA : Level 7 , NEW WARD AREA |
CAN. I INTERIOR FIT-OUT SDN BHD ![]() |
SUSPENSION PLASTER CEILINGDECORATIVE CEILING |
366,540.00 | 2024 |
|
LL THEMED HOTEL SDN BHD PROJECT : LEVEL 1&3 COURTYARD BALCONY CLOSE UP |
DIRECT DEAL WITH OWNER |
CONSTRUCTION WORKALLUMINIUM GLAZING WORKCOMPOSITE CANOPYCEILING WORKM&E WORK |
335,000.00 | 2024 |
|
Ikano Corporation Sdn Bhd PROJECT SITE : IPC SHOPPING CENTRE LG1 MALE & FEMALE TOILET OKU TOILET MOTHER ROOM |
DIRECT DEAL WITH OWNER |
UPGRADING FIT-OUT & TOILETM&E WORKTOILET CUBICLEQUARTZ STONE WORKPLUMBING WORKCONSTRUCTION WORKDECORATICE CEILINGGLASS WORKTILING WORK |
899,000.00 | 2023 |
|
GLENEAGLES HOSPITAL MEDINI , JOHOR PROJECT AREA : GF SATALLITE PHARMACY LEVEL 3 ICU & HDU WARD LG NEW PROJECT OFFICE |
DIRECT DEAL WITH OWNER |
DESIGN & BUILDUPGRADING EXISTING FURNITURECUSTOM MADE FURNITUREPAINTING WORKGLASS WORKSIGNAGE WORK |
239,750.00 | 2023 |
|
TZU CHI MALAYSIA ( ALOR SETAR ) PROJECT SITE : ALOR SETAR |
UPGRADERR SDN BHD ![]() |
ACOUSTIC ALUMINIUM WALL PANEL |
596,780.00 | 2022 |
|
Themed Attractions Resorts & Hotels Sdn. Bhd. Site : Desaru International Ferry Terminal |
DIRECT DEAL WITH OWNER |
UPGRADING WORKMECHANICAL AND ELECTRICAL WORKS |
634,500.00 | 2022 |
|
GLENEAGLES HOSPITAL MEDINI , JOHOR PROJECT AREA : GF NEW WAITING LOUNGE |
DIRECT DEAL WITH OWNER |
DESIGN & BUILDDECORATIVE CEILING FINISHESDESIGN WALL FINISHESCUSTOM MADE FURNITUREPAINTING WORKFIRE PROTECTIONACMVELECTRICAL WORKSIGNAGE WORKTILING WORK |
299,895.00 | 2022 |
|
SUNWAY ISKANDAR SDN BHD Sie : Sunway Iskandar , Bandar Medini Iskandar |
DIRECT DEAL WITH OWNER |
LOOSE FURNITURE SUPPLYCUSTOM MADE FURNITUREID FIT-OUT WORKS |
595,625.00 | 2022 |
|
TZU CHI MALAYSIA ( MUAR ) PROJECT SITE : MUAR , JOHOR |
UPGRADERR SDN BHD ![]() |
CUSTOM MADE CARPENTRY WORKACOUSTIC WALL PANELINGVENEER WALL PANELINGCUSTOM MADE FURNITUREID FIT-OUT WORKS |
2.04 MILLION | 2021 |
|
PETRONAS LEADERSHIP CENTRE PROJECT SITE : BANGI AREA : PLC ADMIN OFFICE MOTHER ROOM , HOSPITALITY SURAU , HOSPITALITY OFFICE , PLC STAFFS CAFE |
SYNERLITZ (M) SDN BHD ![]() |
CUSTOM MADE CARPENTRY WORKMIRROR WORKSTAINLESS STEEL DECORATIVESTONE WORK |
476,000.00 | 2021 |
|
PETRONAS LEADERSHIP CENTRE PROJECT SITE : BANGI SCOPE : 186 UNIT OF RESIDENTIAL UNIT |
SYNERLITZ (M) SDN BHD ![]() |
CUSTOM MADE CARPENTRY WORKMIRROR WORKSTAINLESS STEEL WORKLAMINATE WALLLAMINATE WALL PANELING |
4.98 MILLION | 2021 |
|
PETRONAS LEADERSHIP CENTRE PROJECT SITE : BANGI |
SYNERLITZ (M) SDN BHD ![]() |
PLASTER CEILINGSUSPENDED CEILINGDRYWALL PARTITIONFIRE RATED PARTITION |
534,760.00 | 2021 |
|
KPJ JOHOR SPECIALIST HOSPITAL PROJECT SITE: KPJ ABDUL SAMAD PHYSIONTHERAPY AREA |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN PROPOSALCUSTOM MADE FURNITUREDECORATIVE WALL PANELINGVINYL FLOORING WITH SELF LEVELING FLOORINGPLASTER CEILINGPAINTING WORKWETWORKM&E WORK |
315,678.00 | 2021 |
|
KPJ KLUANG UTAMA SPECIALIST HOSPITAL PROJECT SITE: KPJ KLUANG UTAMA , TAMAN SAUJANA |
DIRECT DEAL WITH OWNER |
INTERIOR DESIGN PROPOSAL FOR ALL COMMON AREACUSTOM MADE FURNITUREDECORATIVE WALL PANELINGVINYL FLOORING WITH SELF LEVELING FLOORINGREPAINTING WORKLOOSE FURNITURESIGNAGE WORKALL DECORATVE FITTINGS |
1.82 MILLION | 2020 |
|
DESARU PEACE HOLDINGS CLUB SDN BHD SITE :DESARU COAST , ONE & ONLY RESORT |
DIRECT DEAL WITH OWNER |
TO REVARNING WORK TO ALL SUITE AND COMMON AREARE-FURBISHMENT WORK |
897,650.00 | 2020 |
|
DESARU PEACE HOLDINGS CLUB SDN BHD SITE :DESARU COAST , JOHOR ALL SUITES MAIN DOOR AND REAR DOOR |
DIRECT DEAL WITH OWNER |
TO REPLACE DAMAGED HAEVY DURY FLOOR HINGES FOR SUITES β MAIN DOOR AND REAR DOOR |
172,000.00 | 2019 |
|
SUNWAY ISKANDAR SDN BHD SUNWAY BIG BIX : HOTEL ROOM |
SUNWAY CONSTRUCTION SDN BHD |
HOTEL ROOM PLASTER CEILING AND DECORATIVE PANEL |
531,450.00 | 2019 |
|
DESARU PEACE HOLDINGS CLUB SDN BHD SITE :DESARU COAST , JOHOR WHOLE RESORT AREA |
DIRECT DEAL WITH OWNER |
SUPPLY AND SETUP MASTER KEY SYSTEM TO ALL RESORT DOOR PANEL |
89,000.00 | 2019 |
|
GLENEAGLES HOSPITAL PROJECT SITE : MOB BUILDING |
PORTLAND ARENA SDN BHD ![]() |
CUSTOM MADE FURNITURE & DECORATIVEPLASTER CEILING AND PAINTING WORKVINYL FLOOR REPAIRING WORK |
987,430.00 | 2019 |
|
UNIVERSITI TEKNOLOGI PETRONAS SITE: BANDAR SERI ISKANDAR 32610 , SERI ISKANDAR , PERAK . |
SYNERLITZ (M) SDN BHD ![]() |
CUSTOM MADE CARPENTRY WORKOFFICE FURNITURECARPET WORKKCEMBOARD CEILINGGLASS WORKM & E WORKVINYL FLOOR TILES |
668,760.00 | 2019 |
|
PETRONAS MALAYSIA SITE: PETRONAS ( PIC ) VISITOR CENTRE |
PLM INTERIOR ![]() |
CUSTOM MADE ID WORKVINYL FLOOR WITH DECORATIVE DESIGN AND SELF LEVELING |
398,000.00 | 2019 |
|
DESARU CORNICHE HOTEL SDN BHD SITE : WESTIN DESARU BLOCK A , GROUND FLOOR LEVEL 4 , 5 , 6 , 7 |
DIRECT DEAL WITH OWNER |
REPLACEMENT WORKREVARNISHING WORKMISC CARPENTRY WORK |
646,000.00 | 2019 |
|
DESARU SOUTH COURSE SDN BHD SITE : OCEAN CLUB HOUSE |
DIRECT DEAL WITH OWNER |
REFURBISMENT WORK TO CLUBHOUSE AND RESTAURANT |
385,000.00 | 2019 |
|
KPJ SPECIALIST JOHOR PROJECT SITE: KLUANG JOHOR |
KTN CONSTRUCTION SDN BHD ![]() |
SUPPLY AND INSTALLATION OF DRYWALL & CEILING |
436,760.00 | 2019 |
|
KPJ SPECIALIST JOHOR PROJECT SITE: BANDAR DATO ONN |
DIRECT DEAL WITH OWNER |
ID WORKSCUSTOM MADE FURNITURE |
332,000.00 | 2019 |
|
UNIVERSITI SULTAN ZAINAL ABIDIN PROJECT SITE: TERENGGANU DARUL IMAN |
PESONA METRO SDN BHD ![]() |
CEILING WORKSDRYWALL PARTITION |
1.70 MILLON | 2019 |
|
DESARU PEACE HOLDINGS CLUB SDN BHD SITE :DESARU COAST , JOHOR ALL SUITES AND ALL BUILDINGS AREA |
DIRECT DEAL WITH OWNER |
REPLACE INTERNAL DECORATION WALL AND WARDBRODE |
237,000.00 | 2019 |
|
SOUTHERN VILLAGE RESORT -CLUBHOUSE SITE: KG LEBAU β PENGERANG , JOHOR |
UPGRADERR SDN BHD ![]() |
CUSTOM MADE INTERIOR FURNITURE FOR HOTEL ROOM |
1.54 MILLION |
2019 |
|
DESARU PEACE HOLDINGS CLUB SDN BHD SITE :DESARU COAST , JOHOR ALL SUITES ROOM |
DIRECT DEAL WITH OWNER |
INTERIOR FEATURE WALL AND SOLID DOOR REPLACEMENT |
1.47 MILLION | 2019 |
|
SOUTHERN VILLAGE RESORT -CLUBHOUSE SITE: KG LEBAU β PENGERANG , JOHOR |
UPGRADERR SDN BHD ![]() |
TILING WORK FOR CLUBHOUSECARPET WORKKK CLUBHOUSESPC FLOORING CLUB HOUSECOMPOSITE DECKINGVINYL FLOORING WITH SELF LEVELING SYSTEM INTERIOR DESIGNCUSTOM MADE FURNITUREID WORKLOOSE FURNITUREPAINTING WORK AND SPECIAL COATING FOR CLUBHOUSE & HOTEL ROOM |
2.73 MILLION |
2019 |
|
DESARU PEACE HOLDINGS CLUB SDN BHD SITE :DESARU COAST , JOHOR ALL SUITES ROOM , SPA BUILDING , CLUBHOUSE , VILLA 22 , KIDCLUB , CONFERENCE HALL , FUNCTION HALL |
DIRECT DEAL WITH OWNER |
SOLIGNUM OIL TO ALL NATURE TIMBER |
1.15 MILLION |
2019 |
|
SOUTHERN VILLAGE RESORT CLUBHOUSE AREA SITE: KG LEBAU β PENGERANG , JOHOR |
SYNERLITZ (MALAYSIA ) SDN BHD ![]() |
DRYWALL AND CEILING SYSTEM FOR CLUBHOUSEDRYWALL AND CEILING FOR HOTEL ROOM |
1.24 MILLION |
2019 |
|
DESARU PEACE HOLDINGS CLUB SDN BHD SITE :DESARU COAST , JOHOR ALL SUITES ROOM |
DIRECT DEAL WITH OWNER |
REPLACEMENT OF HAFFELE SYSTEM FOR WARDROBE |
147,000.00 | 2019 |
|
SOUTHERN VILLAGE RESORT HOTEL ROOM SITE: KG LEBAU β PENGERANG , JOHOR |
UPGRADERR SDN BHD ![]() |
LOOSE FURNITURE FOR HOTEL ROOM |
867,820.00 | 2019 |
|
DESARU CORNICHE HOTEL SDN BHD SITE : WESTIN DESARU |
DIRECT DEAL WITH OWNER |
MISCELLANEOUS REPAIR WORKREVARNISHING WORKMISCELLANEOUS CARPENTRY WORK |
977,000.00 | 2019 |
|
DESARU PEACE HOLDINGS CLUB SDN BHD SITE :DESARU COAST , JOHOR ALL SUITES AREA |
DIRECT DEAL WITH OWNER |
MASTERKEY SYSTEM TO ALL LOCKSET |
83,000.00 | 2019 |
|
PENGERANG GATEWAY HEALTHCARE CENTRE PROJECT SITE: MUKIM PENGERANG (MEDICAL CENTRE) |
SYNERLITZ (MALAYSIA) SDN BHD ![]() |
DRYWALL PARTITIONPLASTER CEILING |
143.000.00 | 2018 |
|
KINSINGTON GREEN SPECIALIST CENTRE PROJECT SITE: TAMAN NUSA INDAH, MUKIM PULAI |
PANCARAN TEMASEK SDN BHD ![]() |
INTERNAL CEILINGREPAIR EXISTING VINYL FLOOR |
680,000.00 | 2018 |
|
SENA LETRIK ( M ) SDN BHD PROJECT SITE : KPJ KLUANG |
KTN CONSTRUCTION SDN BHD ![]() |
CEILING & PARTITION WORKSCUSTOM MADE FURNITURE FOR ALL WARD |
878,000.00 | 2018 |
|
GLENEAGLES HOSPITAL PROJECT SITE : 6 TH FLOOR NUSAJAYA |
PORTLAND ARENA SDN BHD ![]() |
CUSTOM MADE FURNITURE & DECORATIVECUSTOM MADE FURNITURE FOR ALL WARD |
896,000.00 | 2018 |
|
OPTIMAX EYE SPECIALIST PROJECT : SEGAMAT |
DIRECT DEAL WOTH OWNER |
INTERIOR DESIGN & BUILDMISC RENOVATION & CONSTRUCTION WORKOPERATION ROOMCUSTOM FURNITUREVINYL FLOORING |
385,000.00 | 2018 |
|
COUNTRY GARDEN PACIFICVIEW SDN BHD AREA: PRO SHOP GOLF CLUB β PHASE 2 |
DIRECT DEAL WITH OWNER |
CUSTOM MADE CARPENTRY WORKS |
398,000.00 | 2018 |
|
WESTIN DESARU COAST RESORT AREA : GUESTROOM CORRIDOR , MAIN LOBBY , PREFUNCTION & MEETING ROOM , PREGO RESTAURANT , SEASONAL RESTAURANT , PUBLIC TOILET , GM APARTMENT , KIDS CLUB , EXCUTIVE LOUNGE |
PLM INTERIOR ( JOHOR ) SDN BHD ![]() |
CUSMTOM MADE JOINERY & CARPENTRY WORK FOR ALL COMMON AREAPACKAGE 1,2,3,4,5,6,7,8,9 |
3.7 MILLION |
2017 |
|
COUNTRY GARDEN PACIFIVIEW SDN BHD AREA: CLUB HOUSE |
DIRECT DEAL WITH OWNER |
CUSTOM MADE FURNITURE & DECORATIVE |
98,000.00 | 2017 |
|
THE ELS CLUB AREA : VALLEY GOLF SHOP |
PLM INTERIOR ( JOHOR ) SDN BHD ![]() |
CUSMTOM MADE JOINERY & CARPENTRY WORKMISC RENOVATION WORK |
97,000.00 | 2017 |
|
THE ELS CLUB AREA : VALLEY GOLF CLUB LOCKER ROOM , VIP REST ROOM , ALL DAY RESTAURANT , PUBLIC TOILET |
PLM INTERIOR ( JOHOR ) SDN BHD ![]() |
SUSPENDED CEILINGDYWALL PARTITIONCUNSTOM MADE FURNITURESOLID SURFACE |
543,450.00 | 2017 |
|
KPJ SPECIALIST JOHOR PROJECT : BANDAR DATO ONN JOHOR BAHRU |
PLM INTERIOR (JOHOR) SDN BHD ![]() |
CUSTOM MADE FURNITUREID BUILD IN WORK |
1. 78 MILLION |
2017 |
|
RAFFLES AMERICAN SCHOOL PROJECT: INTERIOR DECORATION WORKS,NUSAJAYA MUKIM PULAI |
SCK SERIJADI SDN BHD |
SUSPENSION CEILINGINTERIOR ACOUSTIC PANELID WORK |
1.14 MILION |
2017 |
|
MIE CORPORATE HOLDINGS SDN BHD PROJECT: 2-STOREY KINDERGARDEN BUILDING ENDAU . JOHOR |
DIRECT DEAL WITH OWNER ![]() |
CUSTOM MADE FURNITUREID WORKSLOOSE FURNITURE |
445,000.00 | 2017 |
|
MIE CORPORATE HOLDINGS SDN BHD PROJECT: 2-STOREY KINDERGARDEN BUILDING , ENDAU , JOHOR |
DIRECT DEAL WITH OWNER ![]() |
DUROCK SYSTEM EXTERNAL WALL,INTERNAL DRYWALL PARTITIONACOUSTIS CEILINGDOOR AND WINDOW |
437,000.00 | 2017 |
|
KPJ SPECIALIST JOHOR PROJECT : BANDAR DATO ONN |
PESONA METRO SDN BHD ![]() |
PLASTER CEILING2X2 CELING SYSTEM |
1.47 MILLION | 2016 |
|
OPTIMAX EYE SPECIALIST PROJJECT AREA : CITY SQUARE LEVEL 22 |
DIRECT DEAL WITH OWNER |
REINSTATE WORK TO CITY SQUARE BRACH |
165,550.00 | 2015 |
|
OPTIMAX EYE SPECIALIST PROJJECT AREA : NEW SHOP 53 , JALAN 55 , TAMAN PELANGI INDAH |
DIRECT DEAL WITH OWNER |
INTERIRO DESIGN & BUILDMISC RENOVATION & CONSTRUCTION WORKOPERATION ROOMCUSTOM FURNITURE |
256,500.00 | 2015 |
|
LEGOLAND HOTEL MALAYSIA AREA : GENERAL OFFICE |
DIRECT DEAL WITH OWNER |
CUSTOM MADE OFFICE FURNITURE AND INTERIOR DESIGN |
183,150.00 | 2014 |
|
LEGOLAND MALAYSIA AREA : WATER THEME PARK PHOTOSHOP , RETAIL SHOP , PUBLIC TOILET , F&B COUNTER - PHASE 2 |
SUNWAY CONSTRUCTION SDN BHD ![]() |
CUSTOM MADE FURNITUREOUTDOOR DINING SETCEMENT BOARD DECORATIONF & B COUNTERINTERNAL CEILING & WALL |
376,700.00 | 2013 |
|
SOMERSET MEDINI NUSAJAYA AREA : HOTEL ROOM & ALL AREA |
UEM CONSTRUCTION SDN BHD ![]() |
GYPSUM PARTITIONSUSPENSION CEILINGEPOXY FLOORING |
1..25 MILLION | 2013 |
|
LEGOLAND MALAYSIA PROJECT AREA : LEGOLAND WATER THEME PARK β PHASE 2 |
SUNWAY CONSTRUCTION SDN BHD |
CUSTOM MADE FURNITUREINTERIOR RENOVATION WORK |
299,980.00 | 2013 |
|
LEGOLAND MALAYSIA PROJECT AREA : LEGOLAND WATER THEME PARK β PHASE 1 |
SUNWAY CONSTRUCTION SDN BHD |
CUSTOM MADE FURNITURE |
173.460.00 | 2013 |
|
7-11 CONVENIENT SHOP MAINTENANCE JOHOR BAHRU & MELAKE STATE |
YM DÉCOR RENO. SDN. BHD. |
MONTHLY MAINTENANCEBREAKDOWN CALL SERVICES& TECHNICAL SUPPORT ATJOHOR STATE |
621,000.00 | 2010 |
|
7-11 CONVENIENT SHOP MAINTENANCE JOHOR BAHRU & MELAKE STATE |
YM DÉCOR RENO. SDN. BHD. |
MONTHLY MAINTENANCEBREAKDOWN CALL SERVICES& TECHNICAL SUPPORT ATJOHOR STATE |
660,000.00 | 2009 |
|
7-11 CONVENIENT SHOP MAINTENANCE JOHOR STATE |
YM DÉCOR RENO SDN. BHD. |
MISCELLANEOUS RENOVATION WORK TO NEW STORE AT JOHOR |
376,000.00 | 2008 |
|
DUTY FREE ZONE / EDEN HOTEL JOHOR BAHRU |
KELANA MEGAH SDN. BHD |
ENTRANCE TEMPERED GLASSREPAINTING EXTERNAL WALLREPAINTING INTERNAL WALL & SUSPENSION CEILING |
86,000.00 | 2002 |