CLIENT PROJECT TITLE & LOCATION MAIN CONTRACTOR DESCRIPTION OF WORK VALUE (RM) YEAR
GLENEAGLES HOSPITAL MEDINI, JOHOR
PROJECT TITLE: NEUROSCIENCE SPECIALIST CLINIC COMPLEX
DIRECT DEAL WITH OWNER
  • RENOVATION WORKS
  • INTERIOR ID WORKS
  • MECHANICAL & ELECTRICAL WORKS
3.15 MILLION 2025
DATA CENTRE WITH 60MW DC BUILDING 1
LOCATION: PTD 227196, JALAN MEGA 1, NUSA CEMERLANG INDUSTRIAL PARK
PMX MALAYSIA SDN BHD
  • CEILING WORK
  • ID FIT-OUT WORKS
756,040.00 2025
PODIUM GALLERY FOR MIXED DEVELOPMENT AT KLCC SAMSUNG C&T (KL) SDN BHD
  • DECORATIVE TIMBER CURVING & WAVING FEATURE WALL
690,000.00 2025
GLENEAGLES HOSPITAL MEDINI, JOHOR
PROJECT AREA: BOOMGROW UPGRADING WORK
DIRECT DEAL WITH OWNER
  • ADDITIONAL OUTDOOR LIGHTING
  • EXTERNAL ROOFING
  • WATER DRAINAGE SYSTEM
  • LANDSCAPE WORK
  • EXTERNAL WALKING PATH
  • LOOSE FURNITURE
467,570.00 2025
UNIVERSITY MALAYSIA SPECIALIST CENTRE
PROJECT SITE: UMSC LEVEL 2 SPECIALIST CLINICS
DIRECT DEAL WITH OWNER
  • DEMOLISHMENT WORK
  • ARCHITECTURE WORKS
  • ELECTRICAL WORK
  • ELV SERVICES
  • SANITARY & PLUMBING WORKS
  • ACMV
  • FIRE PROTECTION
  • MEDICAL GAS SERVICES
  • LOOSE FURNITURE
  • CUSTOM-MADE FURNITURE
1.35 MILLION 2025
GLENEAGLES HOSPITAL MEDINI, JOHOR
PROJECT AREA: Oιˆ₯橞RIEN RETAIL SHOP
DIRECT DEAL WITH OWNER
  • INTERIOR DESIGN PROPOSAL
  • NEW EXHAUST SYSTEM
  • NEW SHOPFRONT IMAGE
  • ALUMINIUM FOLDING DOOR
  • GLASS WORK
146,680.00 2024
APUGD SDN BHD
PROJECT SITE: EXHIBITION AT JBCC
DIRECT DEAL WITH OWNER
  • INKJET POSTER
  • TIMBER WALL
  • STALL COUNTER
  • BIG LED SCREEN
  • ELECTRONIC DEVICE
  • PA SYSTEM
  • LOOSE FURNITURE
  • DECORATION
234,500.00 2024
GLENEAGLES HOSPITAL MEDINI, JOHOR
PROJECT AREA: BOOMGROW PROJECT
DIRECT DEAL WITH OWNER
  • EXTERIOR DESIGN & BUILD WORK
  • EXTERNAL CONCRETE WORK
  • CONCRETE IMPRINT
  • EXTERNAL CANOPY
  • LANDSCAPE WORK
  • M & E WORK
  • LOOSE FURNITURE
986,540.00 2024
SUNWAY CONSTRUCTION SDN BHD
PROJECT: K2 DATA CENTRE
PROJECT SITE: SEDENAK
DIRECT DEAL WITH OWNER
  • MODULAR WALL TERMINATION
  • MODULAR FLOOR TERMINATION
  • ALUMINIUM CEILING
  • PLUMBING WORK
  • STAINLESS STEEL WORK
  • DOOR & WINDOW INSTALLATION
2.48 MILLION 2024
KPJ JOHOR SPECIALIST HOSPITAL
PROJECT SITE: KPJ ABDUL SAMAD
L1 - DISCHARGE & ADMISSION SUITE
DIRECT DEAL WITH OWNER
  • REFURBISHMENT WORK
  • UPGRADING WORK
96,750.00 2024
GLENEAGLES HOSPITAL MEDINI, JOHOR
PROJECT AREA: LEVEL 7 NEW WARD AREA
CAN.I INTERIOR FIT-OUT SDN BHD
  • SUSPENDED PLASTER CEILING
  • DECORATIVE CEILING
366,540.00 2023
PELABUHAN TANJUNG PELEPAS SDN BHD
PROJECT SITE: PTP
DIRECT DEAL WITH OWNER
  • DESIGN & PLANNING CONSULTANT
  • FLOOR FINISHES
  • CEILING FINISHES
  • WALL FINISHES
  • CUSTOM-MADE FURNITURE
  • M & E WORK
71,184.00 2023
YTL CONSTRUCTION SDN BHD
PROJECT SITE: DATA CENTRE KULAI, JOHOR
DIRECT DEAL WITH OWNER
  • 2 HOURS FIRE-RATED CEILING
366,500.00 2023
GLENEAGLES HOSPITAL MEDINI, JOHOR
PROJECT AREA:
GF SATELLITE PHARMACY
LEVEL 3 ICU & HDU WARD
LG NEW PROJECT OFFICE
DIRECT DEAL WITH OWNER
  • DESIGN & BUILD
  • UPGRADING EXISTING FURNITURE
  • CUSTOM-MADE FURNITURE
  • PAINTING WORK
  • GLASS WORK
  • SIGNAGE WORK
239,750.00 2023
YTL CONSTRUCTION SDN BHD
PROJECT SITE:
DATA CENTRE KULAI, JOHOR
DIRECT DEAL WITH OWNER
  • PLASTER CEILING
  • 2' X 4' SUSPENDED CEILING SYSTEM
634,750.00 2023
GLENEAGLES HOSPITAL MEDINI, JOHOR
PROJECT AREA:
GF NEW WAITING LOUNGE
DIRECT DEAL WITH OWNER
  • DESIGN & BUILD
  • DECORATIVE CEILING FINISHES
  • DESIGN WALL FINISHES
  • CUSTOM-MADE FURNITURE
  • PAINTING WORK
  • FIRE PROTECTION
  • ACMV
  • ELECTRICAL WORK
  • SIGNAGE WORK
  • TILING WORK
299,895.00 2023
IKANO HANDEL SDN BHD
PROJECT SITE:
IKEA TEBRAU, JOHOR
DIRECT DEAL WITH OWNER
  • REINSTATEMENT WORK
  • CARPENTRY WORK
  • DRYWALL SYSTEM
  • WALL PANELING
100,663.00 2023
OKA MARKETING SDN BHD
PROJECT SITE:
MAJLIS PERBANDARAN KLUANG, JOHOR
OKA MARKETING SDN BHD
  • PLASTER CEILING
  • 2' X 4' CEILING
  • DRYWALL PARTITION
  • METAL CEILING
  • DECORATIVE CEILING
1.75 MILLION 2023
SUNWAY CONSTRUCTION SDN BHD
PROJECT SITE:
SUNCON SEDENAK SITE OFFICE, SEDENAK
DIRECT DEAL WITH OWNER
  • PIR SANDWICH PANEL
  • DRYWALL
  • CEILING WORK
  • WET WORK
  • TOILET CUBICLE
  • M & E WORK
898,878.00 2023
IKANO CORPORATION SDN BHD
PROJECT SITE:
IPC SHOPPING CENTRE
LG1 MALE & FEMALE TOILET
OKU TOILET
MOTHER ROOM
DIRECT DEAL WITH OWNER
  • UPGRADING FIT-OUT & TOILET
  • M & E WORK
  • TOILET CUBICLE
  • QUARTZ STONE WORK
  • PLUMBING WORK
  • CONSTRUCTION WORK
  • DECORATIVE CEILING
  • GLASS WORK
  • TILING WORK
899,000.00 2023
IKEA MALAYSIA
PROJECT SITE: IKEA CHERAS
DIRECT DEAL WITH OWNER
  • JOINERY WORK
  • RE-PAINTING WORK
  • TILING WORK
  • SIGNAGE
  • STEEL WORK
43,650.00 2022
TZU CHI MALAYSIA (ALOR SETAR)
PROJECT SITE: ALOR SETAR
UPGRADER SDN BHD
  • ACOUSTIC ALUMINIUM WALL PANEL
596,780.00 2022
PELABUHAN TANJUNG PELEPAS SDN BHD
PROJECT SITE: PTP
DIRECT DEAL WITH OWNER
  • DESIGN & PLANNING CONSULTANT
  • FLOOR FINISHES
  • CEILING FINISHES
  • WALL FINISHES
  • CUSTOM-MADE FURNITURE
  • M & E WORK
1.05 MILLION 2022
PELABUHAN TANJUNG PELEPAS SDN BHD
PROJECT SITE: PTP
DIRECT DEAL WITH OWNER
  • CUSTOM-MADE PANTRY CABINET
  • PANTRY EQUIPMENT
  • TOILET UPGRADING WORK
  • M & E WORK
298,000.00 2022
KPJ JOHOR SPECIALIST HOSPITAL
PROJECT SITE:
KPJ ABDUL SAMAD PHYSIOTHERAPY AREA
DIRECT DEAL WITH OWNER
  • INTERIOR DESIGN PROPOSAL
  • CUSTOM-MADE FURNITURE
  • DECORATIVE WALL PANELING
  • VINYL FLOORING WITH SELF-LEVELING
  • PLASTER CEILING
  • PAINTING WORK
  • WET WORK
  • M & E WORK
315,678.00 2022
SUNWAY ISKANDAR SDN BHD
SITE: SUNWAY ISKANDAR,
BANDAR MEDINI ISKANDAR
DIRECT DEAL WITH OWNER
  • LOOSE FURNITURE SUPPLY
  • CUSTOM-MADE FURNITURE
  • ID FIT-OUT WORKS
595,625.00 2022
TZU CHI MALAYSIA (MUAR)
PROJECT SITE: MUAR, JOHOR
UPGRADER SDN BHD
  • CUSTOM-MADE CARPENTRY WORK
  • ACOUSTIC WALL PANELING
  • VENEER WALL PANELING
  • CUSTOM-MADE FURNITURE
  • ID FIT-OUT WORKS
2.04 MILLION 2021
PETRONAS LEADERSHIP CENTRE
PROJECT SITE: BANGI
AREA: PIC ADMIN OFFICE, MOTHER ROOM,
HOSPITALITY SURAU, HOSPITALITY OFFICE, PLC STAFF CAFE
SYNERLITZ (M) SDN BHD
  • CUSTOM-MADE CARPENTRY WORK
  • MIRROR WORK
  • STAINLESS STEEL DECORATIVE
  • STONE WORK
476,000.00 2021
PETRONAS LEADERSHIP CENTRE
PROJECT SITE: BANGI
SCOPE: 186 UNIT OF RESIDENTIAL UNIT
SYNERLITZ (M) SDN BHD
  • CUSTOM-MADE CARPENTRY WORK
  • MIRROR WORK
  • STAINLESS STEEL WORK
  • LAMINATE WALL
  • LAMINATE WALL PANELING
4.98 MILLION 2020
PETRONAS LEADERSHIP CENTRE
PROJECT SITE: BANGI
SYNERLITZ (M) SDN BHD
  • PLASTER CEILING
  • SUSPENDED CEILING
  • DRYWALL PARTITION
  • FIRE-RATED PARTITION
534,760.00 2020
KEPPEL DATA CENTRES
PROJECT SITE: SEDENAK, JOHOR
FACILITY LINK CONTRACTS (M) SDN BHD
  • SUSPENDED CEILING
  • FIRE-RATED WALL PARTITION
  • PAINTING WORK
  • SCREEDING WORK
  • CARPENTRY WORK
  • CUSTOM-MADE FURNITURE
364,000.00 2020
YOKOGAWA KONTROL (M) SDN BHD
PROJECT SITE: PENGERANG
DIRECT DEAL WITH OWNER
  • INTERIOR DESIGN & BUILD
  • PLASTER CEILING & DRYWALL
  • M & E WORK
  • FLOOR FINISHES
  • CUSTOM-MADE FURNITURE
  • LIGHT CONSTRUCTION WORK
396,470.00 2020
PETRONAS MALAYSIA
SITE: PETRONAS LUBRICANTS INTERNATIONAL ιˆ₯� MELAKA
PLM INTERIOR (JOHOR) SDN BHD
  • CUSTOM-MADE CARPENTRY WORK
  • OFFICE FURNITURE
231,078.00 2020
KPJ KLUANG UTAMA SPECIALIST HOSPITAL
PROJECT SITE: KPJ KLUANG UTAMA, TAMAN SAUJANA
DIRECT DEAL WITH OWNER
  • INTERIOR DESIGN PROPOSAL FOR ALL COMMON AREA
  • CUSTOM-MADE FURNITURE
  • DECORATIVE WALL PANELING
  • VINYL FLOORING WITH SELF-LEVELING FLOORING
  • REPAINTING WORK
  • LOOSE FURNITURE
  • SIGNAGE WORK
  • ALL DECORATIVE FITTINGS
1.82 MILLION 2020
PETRONAS MALAYSIA
PROJECT SITE: PETRONAS PACKAGE P29, PENGERANG
PLM INTERIOR (JOHOR) SDN BHD
  • CUSTOM-MADE CARPENTRY WORK
  • OFFICE FURNITURE
178,760.00 2019
GLENEAGLES HOSPITAL
PROJECT SITE: MOB BUILDING
PORTLAND ARENA SDN BHD
  • CUSTOM-MADE FURNITURE & DECORATIVE
  • PLASTER CEILING AND PAINTING WORK
  • VINYL FLOOR REPAIRING WORK
987,430.00 2019
UNIVERSITI TEKNOLOGI PETRONAS
PROJECT SITE: BANDAR SERI ISKANDAR 32610, SERI ISKANDAR, PERAK
SYNERLITZ (M) SDN BHD
  • CUSTOM-MADE CARPENTRY WORK
  • OFFICE FURNITURE
  • CARPET WORK
  • CEMENT BOARD CEILING
  • GLASS WORK
  • M & E WORK
  • VINYL FLOOR TILES
668,760.00 2019
PETRONAS MALAYSIA
SITE: PETRONAS (PIC) VISITOR CENTRE
PLM INTERIOR (JOHOR) SDN BHD
  • CUSTOM-MADE ID WORK
  • VINYL FLOOR WITH DECORATIVE DESIGN AND SELF-LEVELING
398,000.00 2019
SOUTHERN POWER GENERATION SDN BHD
SITE: PASIR GUDANG
SMCC MALAYSIA SDN BHD
  • FIRE-RATED CEILING AND PARTITION
770,000.00 2019
SOUTHERN POWER GENERATION SDN BHD
SITE: PASIR GUDANG
SMCC MALAYSIA SDN BHD
  • INTERIOR ID WORK AND FIT-OUT FOR OFFICE BUILDING
870,000.00 2019
KPJ SPECIALIST JOHOR
PROJECT SITE: KLUANG, JOHOR
KTN CONSTRUCTION SDN BHD
  • SUPPLY AND INSTALLATION OF DRYWALL & CEILING
436,760.00 2018
KPJ SPECIALIST JOHOR
PROJECT SITE: BANDAR DATO ONN
DIRECT DEAL WITH OWNER
  • ID WORKS
  • CUSTOM-MADE FURNITURE
332,000.00 2018
UNIVERSITI SULTAN ZAINAL ABIDIN
PROJECT SITE: TERENGGANU DARUL IMAN
PESONA METRO SDN BHD
  • CEILING WORKS
  • DRYWALL PARTITION
1.70 MILLION 2018
PETRONAS MALAYSIA
SITE: PETRONAS (PIC) VASRS MEETING ROOM
PLM INTERIOR (JOHOR) SDN BHD
  • CUSTOM-MADE ID WORK
274,300.00 2019
KENSINGTON GREEN SPECIALIST CENTRE
PROJECT SITE: TAMAN NUSA INDAH, MUKIM PULAI
PANCARAN TEMASEK SDN BHD
  • INTERNAL CEILING
  • REPAIR EXISTING VINYL FLOOR
680,000.00 2018
PENGERANG GATEWAY HEALTHCARE CENTRE
PROJECT SITE: MUKIM PENGERANG (MEDICAL CENTRE)
SYNERLITZ (MALAYSIA) SDN BHD
  • DRYWALL PARTITION
  • PLASTER CEILING
143,000.00 2018
SENA ELEKTRIK (M) SDN BHD
PROJECT SITE: KPJ KLUANG
KTN CONSTRUCTION SDN BHD
  • CEILING & PARTITION WORKS
  • CUSTOM-MADE FURNITURE FOR ALL WARDS
878,000.00 2018
GLENEAGLES HOSPITAL
PROJECT SITE: 6TH FLOOR, NUSAJAYA
PORTLAND ARENA SDN BHD
  • CUSTOM-MADE FURNITURE & DECORATIVE
  • CUSTOM-MADE FURNITURE FOR ALL WARDS
896,000.00 2018
IBU PEJABAT POLIS DAERAH
PROJECT SITE: IPD NUSAJAYA
RUHANIBABA ENTERPRISE SDN BHD
  • INTERNAL & EXTERNAL CEILING WORKS
350,000.00 2018
OPTIMAX EYE SPECIALIST
PROJECT: SEGAMAT
DIRECT DEAL WITH OWNER
  • INTERIOR DESIGN & BUILD
  • MISC RENOVATION & CONSTRUCTION WORK
  • OPERATION ROOM
  • CUSTOM FURNITURE
  • VINYL FLOORING
385,000.00 2017
KPJ SPECIALIST JOHOR
PROJECT: BANDAR DATO ONN, JOHOR BAHRU
PLM INTERIOR (JOHOR) SDN BHD
  • CUSTOM-MADE FURNITURE
  • ID BUILD-IN WORK
1.78 MILLION 2017
SP SETIA ιˆ₯� SKY88
PROJECT: SKY88 BUILDING
LEVEL 1, 9, 9M, 53, 53M
PLM INTERIOR (JOHOR) SDN BHD
  • CUSTOM-MADE JOINERY & CARPENTRY WORK
876,000.00 2017
RAFFLES AMERICAN SCHOOL
PROJECT: INTERIOR DECORATION WORKS,
NUSAJAYA MUKIM PULAI
SCK SERIJADI SDN BHD
  • SUSPENDED CEILING
  • INTERIOR ACOUSTIC PANEL
  • ID WORK
1.14 MILLION 2017
MIE CORPORATE HOLDINGS SDN BHD
PROJECT: 2-STOREY KINDERGARTEN BUILDING,
ENDAU, JOHOR
DIRECT DEAL WITH OWNER
  • CUSTOM-MADE FURNITURE
  • ID WORKS
  • LOOSE FURNITURE
445,000.00 2017
MIE CORPORATE HOLDINGS SDN BHD
PROJECT: 2-STOREY KINDERGARTEN BUILDING,
ENDAU, JOHOR
DIRECT DEAL WITH OWNER
  • DUROCK SYSTEM EXTERNAL WALL
  • INTERNAL DRYWALL PARTITION
  • ACOUSTIC CEILING
  • DOOR AND WINDOW
437,000.00 2017
AME ENGINEERING INDUSTRIES SDN BHD
PROJECT: I-PARK INDAHPURA
DIRECT DEAL WITH OWNER
  • DUROCK EXTERNAL WALL
  • GYPSUM INTERNAL PARTITION
  • SUSPENDED CEILING
MODULAR SYSTEM 2017
PETRONAS MALAYSIA
PROJECT: RAPID PROJECT PACKAGE 12
SMCC MALAYSIA SDN BHD
  • DRYWALL PARTITION
  • PLASTER CEILING
  • 2' X 4' CEILING
  • MISCELLANEOUS CONSTRUCTION WORK
1.64 MILLION 2016
KPJ SPECIALIST JOHOR
PROJECT: BANDAR DATO ONN
PESONA METRO SDN BHD
  • PLASTER CEILING
  • 2' X 2' CEILING SYSTEM
1.47 MILLION 2016
PETRONAS MALAYSIA
PROJECT: PENGERANG PACKAGE #22
RAMO INDUSTRIES SDN BHD
  • FIRE-RATED PARTITION & FIRE-RATED CEILING
  • DRYWALL PARTITION
  • PLASTER CEILING
  • HUME CEMENT BOARD PARTITION
  • DOOR PANEL AND WINDOW PANEL
4.67 MILLION 2016
OPTIMAX EYE SPECIALIST
PROJECT AREA: CITY SQUARE LEVEL 22
DIRECT DEAL WITH OWNER
  • REINSTATEMENT WORK
165,550.00 2015
OPTIMAX EYE SPECIALIST
PROJECT AREA: NEW SHOP 53, JALAN 55,
TAMAN PELANGI INDAH
DIRECT DEAL WITH OWNER
  • INTERIOR DESIGN & BUILD
  • MISC RENOVATION & CONSTRUCTION WORK
  • OPERATION ROOM
  • CUSTOM FURNITURE
256,500.00 2015
PETRONAS MALAYSIA
PROJECT: PENGARRANG
DORCE MALAYSIA SDN BHD
  • MINERAL FIBREBOARD SUSPENSION CEILING
897,500.00 2015
PETRONAS MALAYSIA
PROJECT: PENGARRANG
DORCE MALAYSIA SDN BHD
  • MINERAL FIBREBOARD SUSPENSION CEILING
635,000.00 2015
PETRONAS MALAYSIA
PROJECT: PENGARRANG
DORCE MALAYSIA SDN BHD
  • METAL CEILING
235,000.00 2015
MECHATRONIC INDUSTRIAL SDN. BHD
PROJECT SITE: MMHE MALAYSIA
MECHATRONIC INDUST. SDN. BHD
  • GYPSUM PARTITION
  • SUSPENSION CEILING
  • NYATON DOOR SYSTEM
  • ALUMINIUM PRODUCT
164,287.00 2014
PINEWOOD ISKANDAR MALAYSIA
SITE: PINEWOOD ISKANDAR STUDIO MALAYSIA
SUNWAY CONSTRUCTION SDN BHD
  • INSTALL MARINE PLYWOOD
108,150.00 2013
PINEWOOD ISKANDAR MALAYSIA
SITE: PINEWOOD ISKANDAR STUDIO MALAYSIA
SUNWAY CONSTRUCTION SDN BHD
  • CUSTOM-MADE FURNITURE
  • WOODEN PLATFORM
  • ACOUSTIC WOODEN PANEL
297,560.00 2013
BIO-XCELL MALAYSIA
PROJECT SITE: SLC GELANG PATAH
SUNWAY CONSTRUCTION SDN BHD
  • ALUMINIUM LOUVERS PANEL
78,900.00 2012
EDUCITY ιˆ₯� MULTIVERSITY COMPLEX
PROJECT SITE: NUSAJAYA
GERBANG NUSAJAYA SDN BHD
  • ACOUSTIC SYSTEM CEILING
486,750.00 2012
METRO POINT COLLEGE
CITY SQUARE OFFICE TOWER
28TH FLOOR
DIRECT DEAL WITH OWNER
  • CUSTOM-MADE FURNITURE
  • TEMPERED GLASS
  • FLOOR TILES
  • GYPSUM PARTITION
  • OFFICE FURNITURE
  • M & E WORK
236,700.00 2012
EDUCITY ιˆ₯� MULTIVERSITY COMPLEX
PROJECT SITE: NUSAJAYA
GERBANG NUSAJAYA SDN BHD
  • FIRE-RATED SYSTEM DRYWALL
  • OUTDOOR CEMENT BOARD PANELING
  • VINYL FLOOR REPAIR
286,750.00 2012
LG ELECTRONICS (M) SDN BHD ACTING RENOVATION SDN BHD
  • CUSTOM-MADE FURNITURE FOR ALL RETAIL COUNTER
235,000.00 2011
ASTRO
TAMAN MOLEK BRANCH
CCL FURNISH SDN BHD
  • GYPSUM PARTITION
  • PLASTERGLASS CEILING
  • TEMPERED GLASS
  • DECORATIVE GLASS WORK
  • CARPET FLOORING
  • ROLLER BLIND
  • PAINTING WORK
  • CONSTRUCTION WORKS
119,000.00 2009
7-ELEVEN CONVENIENCE SHOP MAINTENANCE
JOHOR BAHRU & MELAKA STATE
YM DÉCOR RENO. SDN BHD
  • MONTHLY MAINTENANCE
  • BREAKDOWN CALL SERVICES
  • TECHNICAL SUPPORT AT JOHOR STATE
660,000.00 2009
PETRONAS MALAYSIA
PASIR GUDANG
MMC ENG. & CONST. SDN BHD
  • ALUMINIUM WORK
  • OFFICE EQUIPMENT
  • CUSTOM-MADE FURNITURE
  • OPEN PLAN SYSTEM PARTITION
  • TEMPERED GLASS
137,500.00 2008
7-ELEVEN CONVENIENCE SHOP MAINTENANCE
JOHOR STATE
YM DÉCOR RENO. SDN BHD
  • MISCELLANEOUS RENOVATION WORK TO NEW STORE AT JOHOR
376,000.00 2008